I have the pivot points all worked out as to keeping it all as stock, think of it as moving everything down 1-1/2". So when done the CV joints and tie rods see a 2-1/2" lift, Is 2-1/2" of lift too much?
I have the pivot points all worked out as to keeping it all as stock, think of it as moving everything down 1-1/2". So when done the CV joints and tie rods see a 2-1/2" lift, Is 2-1/2" of lift too much?
06 Red Jeep XK 3.7L V6 QT1, RC 2" with 1/2", 1-1/4" Wheel Spacers, Rubicon Moab Rims, Grabber AT2 LT265/70-17, Rocky Road Supersliders, Fastman Throttle-body, K&N Cold Air Filter, JBA Headers, Front Tow Hooks, 2" receiver front & rear, Wired for winch front & rear, ARB Onboard Air, Trans Temp Gauge, Aux Trans Cooler, Sport Roof Crossbars, Skid Plates, RS5010 Rear Shocks, JKS 2034 Front & 2001 Rear Disconnects
There are currently 1 users browsing this thread. (0 members and 1 guests)