Over the last few weeks I have done a lot to the XK. Have been sick, so I haven't posted a lot.
Replaced the BJ's in the front Upper & lower CA's with MOOG.
Replaced the inter & outer Tie Rod Ends for both sides.
Replaced the inter & outer CV boots for the driver side.
Replaced all the bushings in the Front Diff,
Bent my Gas Tank Skid away from hitting my rear drive shaft.
Installed 6k HIDs for the lowbeams
Installed 3k HIDs for the Fogs
Re-centered my Roofrack. I have the unistrut cross bars setup as Sal did & after maybe 6 months the roofrack had moved from center to the right side. I will be fabing a way to lock it in the center.
Whats left to be completed over the month or so;
Front bumper is completed & Tested
The replacement Skid for the A/C lines that run on the underside of the XK
Front & Rear Pads & get the rotors turned
New Tires
MODS I still want to get done with in the next 6 months;
New Rear Steel bumper being Fab'd up
One Off Snorkel
Replacing the front & rear fender flairs with steel (will look similar to factory)
Adding push bars with a step to my 4xGuard Rockrails